# Bridge Alignment

This section assigns a roadway alignment to each bridge in the project, allowing multiple bridges to share or have different alignments.

{% hint style="info" %}
**Navigation:** Bridge Geometry > Bridge Alignment

For detailed parameter explanations, see the [Bridge Alignment Reference](https://docs.openbrim.org/templates/precast-i-girder-bridge-workflow/bridge-geometry-pig/bridge-alignment-pig).
{% endhint %}

## Steps

### Step 1: Navigate to Bridge Alignment

Navigate to **Bridge Geometry > Bridge Alignment** in the tree view.

![Navigation](https://openbrim.atlassian.net/wiki/download/attachments/2235727918/image-20230711-122801.png?api=v2)

### Step 2: Assign Alignment

Click the **three-dots icon** on the alignment cell and select **"Alignment1"** from the dropdown.

![Assign Alignment](https://openbrim.atlassian.net/wiki/download/attachments/2235727918/image-20230711-125611.png?api=v2)

### Step 3: Set Bridge Name

Enter **Bridge1** as the bridge name.

This approach allows different alignments to be assigned to multiple bridges within one project. Each row represents a bridge, and you can assign the appropriate alignment accordingly.

<details>

<summary><strong>Quick Tip:</strong> Bridge Information</summary>

You can enter additional bridge information through the **Bridge Info** tab if needed. This includes project details, owner information, and other metadata.

![Bridge Info](https://openbrim.atlassian.net/wiki/download/attachments/2235727918/image-20230711-123844.png?api=v2)

</details>

## Verification

{% hint style="success" %}
After completing these steps, your Bridge Alignment should match the view shown below. You can now proceed to the **Support Lines** section.
{% endhint %}

![Completed Bridge Alignment](https://openbrim.atlassian.net/wiki/download/attachments/2235727918/image-20241019-104617.png?api=v2)
