Step 1: Click the three-dots icon on the Bridge cell, and then set BRG1.

Step 2: Keep the Add. Point Transverse Loc. and Add. Point Stations as default.

Step 3: After the Project Inputs object is defined, it can be reviewed in the Document section before the analysis and design process. For detailed information, you can refer to the Quick Tip below.
Step 4: Click Slab Elevation Table icon.

Step 5: Switch between the Slab Elevation Table tree view and review the tables.

The completed slab elevation table is illustrated below. Please verify that you have the same model on your end by examining each view provided here. For more information on how to perform visual checks, refer to the quick tips.

To view the entire procedure explained on this page, please watch the recorded Video below.