Girder Erection (Complete)
Last updated
This section defines the complete girder erection construction stage.
Navigation: Construction > Superstructure Construction > Girder Erection (Complete)
For detailed parameter explanations, see the Girder Erection (Complete) Reference.
Girder erection is typically only necessary to consider the non-composite state of girders in a design process. As a result, in general industry practice, girders and cross frames are erected in a single stage. However, if the user needs to model a detailed girder erection process, they can utilize the features available under the 'Girder Erection (Partial)' section.
Navigate to Loading > Construction > Superstructure > Girder Erection (Complete) in the tree view.


Click the three-dot icon on the Stage cell and select GirderStage as the construction stage.
Click the three-dot icon on the Bridge cell and set the Bridge as BRG1.

All girders and bracing should be assigned to the GirderStage.