Steel Tub Girder Bridge Design Reports

Access the Steel Tub Girder Training Example

circle-info

Follow the steps below to open the Steel Tub Girder Training Example.

  1. Log in to your account and locate Project in the top-right corner.

  2. Click Project, then click NEW in the top-left corner.

  3. Under Example Project, click New Project within Steel Tub-Girder Training Example.

  4. Provide a name for your project and open the example.

circle-exclamation

View Design Reports of the Steel Tub Girder Training Example

circle-info

Follow the steps below to run the steel tub-girder code-check reports.

The Steel Tub-Girder Workflow supports the following code-check reports:

  • Steel Tub-Girder Code Check

  • Internal Cross-Frame Code Check

  • Field Splice Code Check

  • Pier Cap Code Check

  • Pier Column Code Check

  • Pier Footing Code Check

  • Pile Capacity Code Check

  1. Make sure the FEM button in the top-middle of the screen is active — the Analysis button only appears when FEM is on.

    circle-exclamation
  2. When the Analysis button appears in the top-left, the FE model has been compiled and is ready to run.

  3. Click Analysis to run the finite element analysis of the steel tub-girder bridge.

    circle-exclamation
  4. When the analysis finishes, click Close to exit the analysis interface.

  5. Click Design to compute the parametric design parameters and collect the analysis results needed for the reports. Track progress in the top-middle of the screen during the design run.

    circle-exclamation
    circle-exclamation
  6. When the design run finishes, click OK to start viewing the reports.

  7. Click Report and Detailed Report in succession to display the available reports.

  8. Detailed Report opens a range of design outputs — quantity reports, camber diagrams, superstructure analysis at 10-foot intervals, code-check reports for individual members, and load-rating reports.

circle-check

Steel Tub-Girder Code Check Report

circle-info

Follow the steps below to access the steel tub-girder code-check reports.

  1. The summary report lists each girder's code-check station and limit state along with the corresponding D/C ratio and Pass/Fail status.

  2. Click the Detailed Report icon to open the detailed report.

See Quick Tips — Exploring Design Variables in Depth below.

Internal Cross-Frame Code Check Report

circle-info

Follow the steps below to access the internal cross-frame code-check reports.

  1. The summary report shows the code-check values for each chord of the cross frame and the gusset-plate bolted-connection checks.

  2. Click the Detailed Report icon (marked in red) for axial-force member checks.

  3. Click the Detailed Report icon (marked in blue) for bolted gusset-plate checks.

See Quick Tips — Exploring Design Variables in Depth below.

Field Splice Code Check Report

circle-info

Follow the steps below to access the field-splice code-check reports.

  1. The summary report shows the D/C ratio for splice plates and bolts at each splice for the strength and service limit states.

  2. Click the Detailed Report icon to open the detailed report.

See Quick Tips — Exploring Design Variables in Depth below.

Pier Cap Code Check Report

circle-info

Follow the steps below to access the pier-cap code-check reports.

  1. The summary report runs pier-cap code checks against the AASHTO design template (marked in red).

  2. Click the Detailed Report icon (marked in red) for AASHTO checks (flexure, shear, torsion, fatigue, reinforcement limits).

See Quick Tips — Exploring Design Variables in Depth below.

Pier Column Code Check Report

circle-info

Follow the steps below to access the pier-column code-check reports.

  1. The summary report shows pier-column results as D/C ratios or Pass/Fail.

  2. Click the Detailed Report icon to open the detailed report (axial-moment interaction, axial compression, shear, torsion, reinforcement limits).

See Quick Tips — Exploring Design Variables in Depth below.

Pier Footing Code Check Report

circle-info

Follow the steps below to access the pier-footing code-check reports.

  1. The summary report shows D/C values and Pass/Fail status for flexure, one-way shear, two-way shear, and reinforcement limits.

  2. Click the Detailed Report icon to open the detailed pier-footing code-check report.

See Quick Tips — Exploring Design Variables in Depth below.

Pile Capacity Code Check Report

circle-info

Follow the steps below to access the pile-capacity code-check reports.

  1. The summary report shows the maximum D/C value against the specified pile capacity.

  2. Click the Detailed Report icon to open the detailed report — the most critical results plus all results across limit states.

See Quick Tips — Exploring Design Variables in Depth below.

Quick Tips: Exploring Design Variables in Depth

circle-info

Tip 1 — Search by keyword

To quickly find a specific design parameter, press CTRL+F and type the keyword.

Tip 2 — Inspect any design parameter

To understand a parameter's annotation, computation, and underlying formula:

i) Hover over the parameter to see its annotation and additional details.

ii) Click the parameter to reveal the formula or expression behind it.

iii) The detailed report itself usually includes the computation and inputs in the surrounding narrative.