Drilled Shaft IGM Non-Cohesive TZ (Mayne and Harris) [Mayne and Harris, 1993]
Category 3 intermediate geomaterials are very dense granular materials (residual and completely decomposed rock, granular glacial till) with between 50 and 100. [Mayne and Harris, 1993] correlated their properties with SPT results in Piedmont residuum and computed the socket load-settlement curve with the elastic solution of Randolph and Wroth; [O'Neill et al., 1996] adopted the method as Model 2 (Chapter 2, Eqs. 41–54, and Chapter 4) with one change for sockets drilled under slurry.
Ultimate Side Resistance
where is the effective vertical stress, the atmospheric pressure and in blows per 0.3 m. Where the borehole is drilled under slurry with good construction control, .
Socket Load-Settlement and t-z Curve
The side resistance is fully mobilized at the socket settlement at the end of the elastic segment of the load-settlement curve:
where,
, = socket length and diameter = modulus of the shaft = modulus of the geomaterial at the base level of the socket, at mid-socket ( = 1 for a uniform layer) = ratio of the side to the base modulus (2.5 for Piedmont residuum) = 1 for straight shafts = Poisson's ratio (about 0.3)
The t-z curve is bilinear: linear from the origin to (, ) and constant beyond. at the node uses the effective stress at the node; the socket quantities use the side resistance at mid-socket. The socket length and the shaft modulus are taken from the pile.
[Mayne and Harris, 1993] Mayne, P. W. and Harris, D. E. (1993). Axial Load-Displacement Behavior of Drilled Shaft Foundations in Piedmont Residuum. FHWA Reference No. 41-30-2175, Georgia Tech Research Corporation, Atlanta. (Report not on file.)
[O'Neill et al., 1996] O'Neill, M. W., Townsend, F. C., Hassan, K. M., Buller, A., and Chan, P. S. (1996). Load Transfer for Drilled Shafts in Intermediate Geomaterials. Report FHWA-RD-95-172, Federal Highway Administration, McLean, VA.