# Construction Load \[CUG]

During the construction of a bridge, various loads are applied to the structure, which may include temporary dead loads and moving live loads. These loads can arise from equipment and machinery used on-site, such as finishing machines, which are crucial in the final stages of construction.

This section of the workflow can be used for such load definitions.

For further explanation, please refer to the related page in the documentation.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.openbrim.org/templates/concrete-u-girder-bridge-workflow/loading-cug/loads-cug/construction-load-cug.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
