Project Analysis Results [SPIG]
Use this section to import analysis results computed in another project into the current workflow. The source project must expose the results under Organization → Cross-Project Data → Analysis Results; this page is the consumer side of that link.
Analysis results are always tied to the object they act on (a girder, column, pile, etc.), so the object itself must first be shared via Project Objects before its results appear here. With a valid setup in the source project — and the Transfer Result Extractions flag set to YES — the result rows populate automatically as linked objects are synced.



Extraction Settings
Project: Source project from which the analysis result is imported. Pick from the projects already linked under External References.
Object: Object within the source project whose result is extracted (e.g. a girder, column, or pile). The pick list is filtered to objects the source project has exposed for sharing.
Result Extraction Method: Method used to pull the result from the source project (e.g. cumulative or incremental staged-construction result, envelope, or combination). Matches the method configured on the source project's Analysis Results definition.
Force Settings: Summary of the Maximize-Force and Min/Max options used at the source to identify the critical result.
Extracted Forces
Fx: Extracted axial force from the source project. (Read-only)
Fy: Extracted transverse shear force. (Read-only)
Mx: Extracted moment about X. (Read-only)
My: Extracted moment about Y. (Read-only)
Mz: Extracted moment about Z. (Read-only)
Coordinate System: Coordinate system in which the forces and moments above are reported (local or global). (Read-only)
Last updated