Backfill Soil Construction [TB]
Backfill Soil Construction
Places one Backfill Soil object into the staged construction model at a stage. The passive soil springs of the picked soil are generated by this object and join the analysis at the selected stage, the same way the abutment itself joins at its Abutment Construction stage. Every value of the springs (profile, directions, behavior, wing walls and the elevation band) comes from the picked Backfill Soil, so a staged model and an unstaged one describe the same soil and differ only in when it arrives.
A fill raised in lifts is modeled cumulatively, one Backfill Soil object per lift, each constructed at its own stage. Each construction automatically switches off the springs of the other lifts on the same abutment from its stage on, so the deeper lift replaces the shallower one instead of adding to it. There is nothing to connect by hand: add one soil object and one construction object per lift.
In a construction stage analysis the springs are active from the selected stage on. In an analysis case that is not part of the construction sequence, all springs are active, so that case sees the same soil stiffness as an unstaged model.
General
Stage: The construction stage at which the backfill is placed and its springs join the analysis. The user must provide a value.
Backfill Soil: Pick the Backfill Soil object to construct. Its Staged Construction input must be set to Yes; otherwise that soil already generates its own springs and the passive stiffness would be doubled, which is reported as a validation issue. The user must provide a value.
Last updated