Skip to content
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Backfill Soil Deconstruction [TB]

Backfill Soil Deconstruction

Removes a backfill from the staged construction model at a stage, for example to model an excavation behind an abutment. The springs generated by the Backfill Soil Construction objects of the picked soil are switched off at the selected stage and stay off in every later stage. This object generates no springs of its own.

All lifts of the picked soil's abutment that were placed at other stages are switched off, so the live lift is removed whichever it is. A lift constructed at the same stage as this object is kept, so a remove-and-replace sequence authored on one stage keeps the new fill.

This object removes the soil completely. To take a fill down to a lower height instead, add another Backfill Soil object with the lower profile and construct it at that stage: its construction replaces the higher lift.

Removing the soil support does not remove the lateral earth pressure on the wall, which is defined separately by Abutment Earth Pressure. In an analysis case that is not part of the construction sequence, this object has no effect.

General

Stage: The construction stage at which the backfill is removed. The user must provide a value.

Backfill Soil: Pick the Backfill Soil object to remove. Its Staged Construction input must be set to Yes; with No, that soil's springs belong to no construction stage and cannot be removed, which is reported as a validation issue. The user must provide a value.

Last updated