Girder Load [TB]
Girder loads are applied as line loads along the top or bottom flange of a selected girder. The magnitude is entered in terms of per-unit-length forces and moments, and the load is activated at a user-selected construction stage.
Girder: Select the girder to which the load will be applied. The user must provide a girder selection; the bridge alignment and flange reference points are pulled from the selected girder.
Stage: Choose the construction stage at which to apply the line load. When left empty, the load is defined but not activated on any construction stage.
Applied Flange [Top/Bottom]: Specify whether the line load is applied along the top flange (1, default) or the bottom flange (2) of the selected girder.
Fx: Force per unit length in the longitudinal direction along the girder alignment.
Fy: Force per unit length in the direction perpendicular to the girder alignment.
Fz (Gravity): Force per unit length in the vertical direction. A positive value indicates a load in the global -Z (gravity) direction. For typical self-weight-like loads (wearing surface, stay-in-place formwork, utility lines), enter positive values.
Mx: Moment per unit length about the longitudinal axis along the girder alignment.
My: Moment per unit length about the axis perpendicular to the girder alignment.
Mz: Moment per unit length about the vertical axis.
Last updated