Point Load [TB]

The Point Load workflow item applies a concentrated force and moment at a selected insertion point at a chosen construction stage. Use it for loads that act at a single, explicitly located node — utility attachments, equipment, or any miscellaneous concentrated dead load.

Point Load

Insertion Point: Select the insertion point at which the load is applied. The load is assigned to the node associated with that insertion point.

Stage: Choose the construction stage at which to apply the point load. When left empty, the load is defined but not activated on any construction stage.

Fx: Force in the longitudinal direction along the alignment.

Fy: Force in the direction perpendicular to the alignment.

Fz (Gravity): Force in the vertical direction. A positive value indicates a load in the global -Z (gravity) direction, so typical gravity-type loads are entered as positive values.

Mx: Moment about the longitudinal axis along the alignment.

My: Moment about the axis perpendicular to the alignment.

Mz: Moment about the vertical axis.