Backfill Soil [TB]
Backfill Soil
The Backfill Soil object models the passive resistance of the backfill behind an abutment. Add it to the project and pick an abutment: area springs are generated on the abutment's backwall face (and optionally on its wing walls) in its own finite element mesh, and the soil is drawn in 3D behind the wall. Adding the object is what turns the soil springs on. It supports the Cantilever, Integral and Semi-Integral abutments.
One abutment can carry several Backfill Soil objects, one per lift of a fill placed in stages. The lifts are cumulative: each object describes the fill as it stands at one stage, measured from the bottom of the wall every time rather than the increment added. A fill raised to 10 ft and then to 30 ft is two objects, with profiles running 0 to 10 ft and 0 to 30 ft, each constructed at its own stage by a Backfill Soil Construction object. The springs of each object stop at the top of its own profile, and each construction automatically switches off the lifts placed before it, so overlapping profiles never double the passive stiffness.
General
Abutment: Pick the abutment the backfill bears on. The springs are generated against that abutment's own finite element mesh. Only abutments that support backfill soil can be used (Cantilever, Integral and Semi-Integral); any other pick is reported as a validation issue, because no springs would be generated. If a supported abutment is reported, update the project to the latest library version. The user must provide a value.
Spring Behavior [Compression Only/Linear]: The behavior of the soil springs.
Compression Only (default): The springs resist only the wall moving into the backfill, which is the physically correct behavior: backfill cannot pull the wall back. The analysis becomes nonlinear.
Linear: The springs act in both directions with full stiffness. This keeps the analysis linear, which suits a first-pass model or a modal or response spectrum case, but the soil then carries tension it cannot actually provide. Choose it deliberately.
Apply Soil to Wingwalls [No/Yes]: Applies the same backfill to the abutment's wing walls as well. The backfill sits between the wing walls, so each wing wall gets its own spring region acting toward its soil side. The default is No, since including the wing walls in the passive resistance is a modeling decision.
Staged Construction [No/Yes]: Controls when the springs join the analysis.
No (default): The springs are generated directly by this object and are active in every analysis case. This is the ordinary single-fill model.
Yes: This object generates no springs itself. They are generated instead by a Backfill Soil Construction object that picks this soil, and they join the staged model at that object's stage. With Yes and no construction object, the abutment has no passive soil springs at all; this is reported as a validation issue.
When several Backfill Soil objects bear on the same abutment, every one of them must be set to Yes. An object left at No springs its band in every case, and no stage can switch it off, so it would add to the stiffness of the other lifts.
Backfill Soil Profile: A table with one row per soil level behind the wall; two rows describe the ordinary passive pressure that grows linearly with depth, and more rows describe a layered profile. The springs interpolate between the levels at each mesh node's elevation. The top row of the profile is the top of this lift's fill: the springs stop there (see Fill Top). The default values describe a plausible compacted granular backfill, intended only as a starting point; replace them with the values of the geotechnical report before any result is used. Each row has the following columns:
Datum [Absolute Elevation/Offset Below Soil Top]: How the level of the row is measured. Absolute Elevation is the surveyed elevation, as in a boring log, and does not move if the vertical alignment is revised later. Offset Below Soil Top is measured down from the top of the backfill, so the level follows the structure; use it for levels defined by the wall, such as the backfill surface or a compacted zone of fixed thickness. The two can be mixed in one profile.
Elevation / Offset: The elevation or the offset below the soil top of the level, according to the Datum.
Input [Modulus + Limit/Limit + Movement/Soil Properties]: Which values describe the soil at this level. All three end in a subgrade modulus and a passive pressure limit per unit area.
Modulus + Limit: The subgrade modulus and the passive pressure limit are entered directly, for example from a report or an agency table. Note that the pair implies the wall movement that mobilizes the limit (limit divided by modulus); when the limit is small against the modulus, the springs reach their limit almost immediately.
Limit + Movement (default): The passive pressure limit and the wall movement that mobilizes it are entered, and the modulus follows as the limit divided by the movement. This is the pair geotechnical sources usually give.
Soil Properties: The effective unit weight, the friction angle and the mobilization ratio are entered, and the level is derived by Rankine theory: Kp = tan²(45° + φ/2), the limit is Kp × γ × depth below the top level of the profile, and the modulus is the limit divided by the mobilization ratio times the profile height. Both are zero at the top of the profile, where passive resistance is zero.
Subgrade Modulus (F/L³): The modulus of subgrade reaction. Used with Modulus + Limit.
Passive Pressure Limit (F/L²): The ultimate passive pressure. Used with Modulus + Limit and Limit + Movement.
Movement to Mobilize Limit: The wall movement at which the passive pressure limit is reached. Used with Limit + Movement.
Effective Unit Weight: The effective unit weight of the backfill. Used with Soil Properties.
Friction Angle: The friction angle of the backfill. Used with Soil Properties.
Mobilization Ratio (movement / wall height): The wall movement, as a fraction of the wall height, at which full passive pressure is mobilized, typically about 0.01 for dense sand and 0.05 for loose sand. Used with Soil Properties.
Backfill Soils on This Abutment: The number of Backfill Soil objects bearing on the picked abutment, this one included. (Read-only)
Fill Top (Spring Band Top): The elevation where this object's springs stop, taken from the top row of the Backfill Soil Profile. To change it, edit the profile. (Read-only)
3D Settings
Show Soil in 3D [No/Yes]: Draws the backfill soil behind the wall in the 3D view. The soil is drawn only when the picked abutment supports backfill soil, so the drawing never appears without the springs it represents.
Label Soil Layers in 3D [No/Yes]: Labels the soil layers in the 3D view. Available when Show Soil in 3D is Yes.
Soil Depth Shown Behind Wall: How far behind the wall the soil block is drawn in the 3D view. It affects the drawing only, not the springs. Available when Show Soil in 3D is Yes.
Referencing Objects
Backfill Soil Peers: The Backfill Soil objects bearing on the same abutment. (Read-only)
Backfill Soil Constructions: The Backfill Soil Construction objects that pick this soil. The list is filled automatically when a construction object picks it. (Read-only)
Backfill Soil Deconstructions: The Backfill Soil Deconstruction objects that pick this soil. The list is filled automatically when a deconstruction object picks it. (Read-only)