Structure Excavation [SPIG]
The Structure Excavation object calculates the volume of earth that needs to be removed to construct a foundation. It automatically generates excavation geometry from a selected footing and computes quantities based on the original ground surface.
General
Foundation: Select the footing that defines the excavation boundary. The excavation extends from the footing bottom to the original ground surface. This is a required input.
Excavation Type: Determines the shape of excavation walls.
Vertical (0): Straight vertical walls from bottom to top
Sloped (1): Angled walls that widen toward the top for soil stability
Slope Ratio (H/V): The horizontal to vertical ratio for sloped excavation walls. Only shown when Excavation Type is set to Sloped. Common values include:
1:1 (45 degrees)
1.5:1 (gentle slope)
2:1 (very gentle slope)
A ratio of 1.5 means 1.5 feet horizontal for every 1 foot vertical. Must be a positive value.
Boundary Offset Beyond Footing: Additional clearance distance beyond the footing edge in all directions. This provides working space around the footing for construction activities. Default is 12 inches. Must be non-negative.
Top Elevation
Elevation Source: Method to define the original ground surface.
Elevation (0): Manual input of a single elevation value for flat ground
From DTM (1): Use a Digital Terrain Model for variable ground surface
Top Elevation: Manual elevation of the original ground surface. Only shown when Elevation Source is set to Elevation. This represents the existing ground surface before excavation.
Digital Terrain Model: Select a DTM object representing the existing ground. Only shown when Elevation Source is set to From DTM. The DTM must cover the excavation area.
Display
Show Excavation: Toggle to show or hide the excavation volume in the 3D view.
Opacity: Transparency of the 3D visualization. Range from 0 (fully transparent) to 1 (fully opaque). Default is 0.7.
Quantities
All quantity fields are read-only computed values.
Excavation Volume: Total volume of earth to be removed. Calculated using:
DTM mode: Computed prism volume from terrainGrid function
Elevation mode (Vertical): Average Depth × Bottom Area
Elevation mode (Sloped): Frustum formula = (h/3) × (A_bottom + A_top + √(A_bottom × A_top))
Top Surface Area: Area of the original ground surface within the excavation boundary.
Bottom Surface Area: Area at the bottom of the excavation (at footing bottom elevation).
Min Excavation Depth: Minimum depth from ground to footing bottom. Particularly useful with DTM input to show the shallowest point.
Max Excavation Depth: Maximum depth from ground to footing bottom. Shows the deepest point of excavation.
Average Excavation Depth: Average depth of excavation across the area.
Supported Foundation Types
Structure Excavation works with:
Custom Footing (OBPFoundation): Footing with point list or section-based geometry
Rectangular Footing (OBPFoundationRectangular): Standard rectangular footing
The excavation boundary is automatically derived from the footing polygon, offset outward by the specified boundary offset distance.