Structure Excavation [PIG]
The Structure Excavation object calculates the volume of earth that needs to be removed to construct a foundation. It automatically generates excavation geometry from a selected footing and computes quantities based on the original ground surface.
General
Foundation: Select the footing that defines the excavation boundary. The excavation extends from the footing bottom to the original ground surface. This is a required input.
Excavation Type: Determines the shape of excavation walls.
Vertical (0): Straight vertical walls from bottom to top
Sloped (1): Angled walls that widen toward the top for soil stability
Slope Ratio (H/V): The horizontal to vertical ratio for sloped excavation walls. Only shown when Excavation Type is set to Sloped. Common values include:
1:1 (45 degrees)
1.5:1 (gentle slope)
2:1 (very gentle slope)
A ratio of 1.5 means 1.5 feet horizontal for every 1 foot vertical. Must be a positive value.
Boundary Offset Beyond Footing: Additional clearance distance beyond the footing edge in all directions. This provides working space around the footing for construction activities. Default is 12 inches. Must be non-negative.
Top Elevation
Elevation Source: Method to define the original ground surface.
Elevation (0): Manual input of a single elevation value for flat ground
From DTM (1): Use a Digital Terrain Model for variable ground surface
Top Elevation: Manual elevation of the original ground surface. Only shown when Elevation Source is set to Elevation. This represents the existing ground surface before excavation.
Digital Terrain Model: Select a DTM object representing the existing ground. Only shown when Elevation Source is set to From DTM. The DTM must cover the excavation area.
When using DTM mode, the excavation volume is computed as a precise prism volume between the DTM surface and the excavation bottom. This accounts for natural ground variations across the excavation area.
Display
Show Excavation: Toggle to show or hide the excavation volume in the 3D view.
Opacity: Transparency of the 3D visualization. Range from 0 (fully transparent) to 1 (fully opaque). Default is 0.7.
Quantities
All quantity fields are read-only computed values.
Excavation Volume: Total volume of earth to be removed. Calculated using:
DTM mode: Computed prism volume from terrainGrid function
Elevation mode (Vertical): Average Depth × Bottom Area
Elevation mode (Sloped): Frustum formula = (h/3) × (A_bottom + A_top + √(A_bottom × A_top))
Top Surface Area: Area of the original ground surface within the excavation boundary.
Bottom Surface Area: Area at the bottom of the excavation (at footing bottom elevation).
Min Excavation Depth: Minimum depth from ground to footing bottom. Particularly useful with DTM input to show the shallowest point.
Max Excavation Depth: Maximum depth from ground to footing bottom. Shows the deepest point of excavation.
Average Excavation Depth: Average depth of excavation across the area.
Supported Foundation Types
Structure Excavation works with:
Custom Footing (OBPFoundation): Footing with point list or section-based geometry
Rectangular Footing (OBPFoundationRectangular): Standard rectangular footing
The excavation boundary is automatically derived from the footing polygon, offset outward by the specified boundary offset distance.